FEATURES / ADVANTAGES
- It provides dust free, seamless floor which is extremely easy to clean.
- Good abrasion resistance withstands foot and light vehicular traffic.
- Excellent in chemical resistance.
- Available in a wide range of colours to provide a very attractive floor finish.
TYPICAL APPLICATION
- Mainly used on floor where high degree of cleanliness and hygiene are required.
- Can be used for hospital clean rooms, electronic assembly areas, food and chemical plant, Slaughter houses and distilleries.
TYPICAL CHARACTERISTICS
Nature |
:
|
Three Component (Part I, Part II & Graded Filler) |
Colour
|
: |
Light grey, dark grey, light green, light blue. etc. Colours can be provided as per the specifications if so required. |
| Mixing
ratio, part by weight |
:
|
Part I: Part
II: Part
III:
(Base) (Hardener)
( Filler )
3 1
7 |
Pot
life at 30°C |
: |
1 hour |
| Initial
cure at 30°C (light foot traffic) |
: |
18 hours |
| Total
Curing time at 30°C. |
: |
6 days |
ENGINEERING DATA :
|
|
|
|
Specification Complies |
: |
British Standard
Specification, BS - 6319 |
|
Flexural Strength, Kg/cm²
|
: |
350 |
| Tensile
Strength, Kg/cm² |
: |
180 |
| Impact
Resistance, Kg/cm² |
: |
5
To 6 |
| Abrasion
Resistance, mm |
: |
2 |
| Compressive
Strength, Kg/cm² |
: |
500 |
DIRECTIONS
FOR USE
SURFACE, PREPARATION
New concrete or cementitious substrates should have been placed for at least 28 days and
have moisture content of less than 5% before topping with Techfloor SL-2. .
All substrates should be sound and free from contamination such as mortar and paint
splashes, curing compound residue oil & grease. Excessive laitance should be removed by light mechanical scrabbling grinding or grit blasting. Light laitance may be removed by acid etching with Masterklean CL1 followed by thorough washing with clean water and then allowing the surface to dry.
MIXING
Techftoor SL- 2 is supplied in pre-weighed packs ready to use on site. Do not add solvent or thinner, though mixing is essential. Mix Part II & Part I in their individual containers homogeneously. Mix Part I with Part II under or with a mechanical stirrer till a homogenous, even mix is obtained. Add filler part under stirring to get homogenous mix.
LAYING
The material is poured on to the substrate and spread to the required thickness with a steel trowel.
Immediately after spreading the floor should be timely rolled.
CLEANING
Tools and equipment should be cleaned with solvents like xylene, acetone etc. immediately.
COVERAGE
Typically at 2 mm thickness - 0.25 to 0.3 Sq. Meter per one kg pack.
STORAGE AND SHELF LIFE
In unopened packs have a shelf life of 12 months when stored in ware house conditions below 35°C. and 50% R.H.
PACKING: 7, 14 Kgs.
PRECAUTIONS
- If mixed resin comes in contact with skin, it must be removed before it hardens with a resin removing cream followed by washing with soap and water, do not use solvent.
- If an accidental eye contamination occurs with any of the above products, wash well with plenty of clean water and seek medical advice.
|